Ajaokuta-led, platform-wide interfaces
Common-User Industrial Services
Shared utilities, workshops, training, quality services, truck control, waste handling and estate management reduce tenant duplication.
Engineering basisKogi SAPZ
The site-serving systems supporting uptime, compliance, logistics, security and industrial operations.
Ajaokuta-led, platform-wide interfaces
Shared utilities, workshops, training, quality services, truck control, waste handling and estate management reduce tenant duplication.
Engineering basisPlatform-wide
Integrated operational reporting across farms, ATCs, utilities, tenants, warehouses, logistics, quality and commercial performance.
Engineering basisAll five nodes
Source segregation, local pretreatment, by-product routes, secure hazardous storage and integrated handling facilities.
Engineering basisAll five nodes
Concept-level 33 kV/11 kV intake and distribution arrangements, distributed transformer nodes, embedded solar and battery support.
Engineering basisATCs, Ajaokuta and Zariagi
Grading, moisture, residue, process quality, certification and chain-of-custody controls support specification-led domestic and export routes.
Engineering basisAll nodes
Concept road families and internal networks support heavy-truck spines, service loops, local access, separated gates and truck control.
Engineering basisAll five nodes
Concept road families and internal networks support heavy-truck spines, service loops, local access, separated gates and utility corridors.
Engineering basisAll five nodes
Perimeter control, separated access, CCTV corridors, truck routing, emergency assembly and operating protocols are embedded in the planning logic.
Engineering basisATCs, Ajaokuta and Zariagi
Aggregation stores, industrial warehousing, truck marshalling, cold rooms, pre-cool, bonded dispatch and cargo consolidation are integrated across the operating route.
Engineering basisAll five nodes
Package treatment at the ATCs and zoned central treatment arrangements at Ajaokuta and Zariagi, with process-stream separation.
Engineering basisAll five nodes
Borehole-led modular ATC systems and central or hybrid bulk-source arrangements for Ajaokuta and Zariagi.
Engineering basisDesign maturity
Final capacities, routes, pressure classes, protection, treatment processes and quantities require site data and detailed design.
Site roles, network hierarchy, indicative capacities, utility corridors and major plant arrangements.
Topography, geotechnical, hydrology, source, point-of-connection, tenant load and process-characterisation studies.
Models, calculations, drawings, specifications, equipment schedules, BoQs, approvals and issued design status.