Power and Energy

Concept-level 33 kV/11 kV intake and distribution arrangements, distributed transformer nodes, embedded solar and battery support.

ASSET00879Public information record

Concept-level 33 kV/11 kV intake and distribution arrangements, distributed transformer nodes, embedded solar and battery support.

Complete point-of-connection studies, load schedules, load flow, protection, earthing, cable sizing, metering, SCADA/EMS and tender design.

Current design basis

Concept-level 33 kV/11 kV intake and distribution arrangements, distributed transformer nodes, embedded solar and battery support.

Required engineering stage

Complete point-of-connection studies, load schedules, load flow, protection, earthing, cable sizing, metering, SCADA/EMS and tender design.