
Kogi SAPZ Industrial Waste Systems
Stage: Concept planning basis
Industrial waste is segregated at source with ETP/IWHF handling, secure hazardous storage and recovery routes aligned to tenant/process mix.
Node-level water, power, sewage and industrial-waste systems are surfaced here as structured infrastructure records.
Infrastructure records set out water, power, sewage and industrial-waste systems by node.

Stage: Concept planning basis
Industrial waste is segregated at source with ETP/IWHF handling, secure hazardous storage and recovery routes aligned to tenant/process mix.
Stage: Concept planning basis
ATCs use package treatment with process pretreatment where required, while Ajaokuta AIH and Zariagi rely on zoned collection and central treatment systems.
Stage: Concept planning basis
ATCs are based on 11 kV incomers with solar support while Ajaokuta AIH and Zariagi use 33 kV intake-led systems with staged internal distribution.

Stage: Concept planning basis
ATCs use standalone borehole-led systems while Ajaokuta AIH and Zariagi use central or hybrid source arrangements with treatment and zoned storage.